Energy Training Centre. Unit 3 Whitemoor Court Nottingham NG8 5BY info@energytrainingcentreltd.co.uk 01159 425566

» Commercial Natural Gas

CODNCO1, COCN1, CORT1, CIGA1, CDGA1, TPCP1, ICPN1, MET4
(Changeover from domestic to commercial, Core Commercial Gas Safety, Radiant heaters, Indirect/direct fired boilers, soundness testing & purging of all pipe work systems, Installation of pipe work, to include steel, copper and polyethylene pipe work and fittings, Meters up to 40 cubic meters per hour)

Are you a domestic engineer wishing to extend your scope of work to commercial?

Are you already a commercial engineer requiring a renewal?

If so then these are the course for you.

RE-ASSESSMENT?? On expiry, engineers are eligible to take re-assessment. The re-assessment can be taken up to 6 months prior to the expiry date of the initial qualification without losing out (MOT Style). Previous certificates must be presented to the assessment centre as evidence of holding the initial qualification.Candidates wishing to take re-assessment must have held the assessment element previously – if this element has expired within 12 months of the assessment date, it will be necessary to take the initial assessment.

INITIAL CANDIDATE? First time commercial? Extending scope from domestic? We are here to  help upon completion and beyond.  We offer additional training after the course at no expense should you require it.

COURSE SUMMARY

COCN1/CODNCO1:Core Commercial Gas Safety OR Changeover from domestic to commercial:Tightness testing principles, pipe volume, purge volumes,Commercial pipework,Pipe sizing,Pipework defects and faults,Unsafe situations and emergency actions,Appliance controls,Combustion,Commercial flues,Gas safety legislation, Commercial ventilation

CORT1/CIGA1/CDGA1: covers the commission, service, repair and breakdown of commercial radiant plaque, radiant tube heaters, Indirect and direct fired boilers. It covers the checking operations of safety components and recognition of faults and appliance installation and servicing.

TPCP1/ICPN1: All Commercial and Industrial Testing and Purging of Pipework to IGE/UP/1 up to 16 Bar operating pressure & 1st Fix pipework above 35mm


Complete the small form below and a member of our team will call you back.

Your Name *
Telephone Number *
What would you like to talk about?

Comments are closed.